DBSDurg Bhilai Solar

4 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process

4 kW par ₹1,08,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

4 kW residential rooftop par PM Surya Ghar ke tehat ₹78,000 central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹1,08,000 tak. 3 kW ke baad central support badhta nahi — isliye yahi woh range hai jahan subsidy ka percentage sabse behtar baithta hai.

4 kW par support ka percentage

4 kW par support 3 kW jitna hi rehta hai — 78,000 central aur 30,000 state. Percentage mein yeh 3 kW se kam baithta hai, aur yahi is size ka sabse zyada poocha jaane wala sawaal hai. Dekhne ka sahi tareeka yeh hai: extra kilowatt par aap poora paisa de rahe hain, aur uske badle poora extra generation le rahe hain. Agar aapka bill us extra generation ko absorb karta hai, to sauda theek hai; agar nahi, to 3 kW behtar hai.

Support kaise banta hai

Capacity slabCentral supportCG state support
1 kW tak₹30,000₹15,000
2 kW tak₹60,000₹30,000
3 kW aur upar₹78,000₹30,000
Aapka 4 kW system₹78,000₹30,000
PM Surya Ghar slab structure aur 4 kW par uska effect

Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 4 kW par yeh gross price ka lagbhag 44% banta hai.

Eligible kaun hai

  • Residential consumer, jiske naam par CSPDCL ka domestic connection ho
  • Roof par ownership ya society ki likhit permission
  • Installation ALMM-listed DCR panels ke saath, registered vendor se
  • Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti

Process — registration se paise aane tak

  1. 1PM Surya Ghar portal par consumer number aur mobile se registration
  2. 2CSPDCL ki technical feasibility approval ka intezaar
  3. 3Registered vendor select karke installation
  4. 4Installation ke baad plant details aur photos portal par upload
  5. 5CSPDCL inspection aur bi-directional net meter installation
  6. 6Commissioning certificate generate hone ke baad bank details submit
  7. 7DBT ke through subsidy seedhe bank account mein

Documents ready rakhiye

  • Latest CSPDCL bill (consumer number ke liye)
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque — DBT isi account mein aayega
  • Roof ownership proof ya society NOC

Durg-Bhilai mein practical baat

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

4 kW ka layout aur terrace ki planning

4 kW par chhat ka layout pehli baar tightly plan karna padta hai. Aath modules ko aksar do ya teen rows mein baanta jaata hai, aur agar terrace par tanki, mumty aur seedhi teenon hain, to bina elevated structure ke poora array fit nahi baithta. Is size par survey mein hum aam taur par do layout banate hain — ek standard structure par, ek elevated par — aur cost aur usable area dono ka farak saamne rakhte hain.

Aksar poochhe jaane waale sawaal

Subsidy aane mein kitna time lagta hai?
Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
Kya battery par bhi subsidy milti hai?
Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
DCR panel zaroori hai kya?
Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
3 kW se 4 kW par jaana samajh mein aata hai?
Tab, jab aapka bill extra generation ko absorb kar sake. Support dono par same hai, isliye extra kilowatt ka poora paisa aapka lagta hai — aur uska poora fayda tabhi milta hai jab woh units aap khud use karein.
4 kW par three-phase chahiye?
Aam taur par nahi — 5 kW tak single-phase chalta hai. Three-phase ka sawaal usse upar aata hai, ya tab jab aapka connection pehle se three-phase ho.

Sources

Related guides