5 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process

5 kW par ₹1,08,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

5 kW residential rooftop par PM Surya Ghar ke tehat ₹78,000 central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹1,08,000 tak. 3 kW ke baad central support badhta nahi — isliye yahi woh range hai jahan subsidy ka percentage sabse behtar baithta hai.

5 kW par support ka asli percentage

5 kW par support 1,08,000 rehta hai, jo gross price ka lagbhag ek-tihai banta hai. Log aksar yeh maan lete hain ki bade system par zyada subsidy milegi — nahi milti. Isliye 5 kW ka faisla support percentage par nahi, aapke actual load par hona chahiye. Aur ek baat jo har quotation par clear honi chahiye: support price mein se katta nahi, commissioning ke baad DBT se aata hai.

Support kaise banta hai

Capacity slabCentral supportCG state support
1 kW tak₹30,000₹15,000
2 kW tak₹60,000₹30,000
3 kW aur upar₹78,000₹30,000
Aapka 5 kW system₹78,000₹30,000
PM Surya Ghar slab structure aur 5 kW par uska effect

Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 5 kW par yeh gross price ka lagbhag 35% banta hai.

Eligible kaun hai

  • Residential consumer, jiske naam par CSPDCL ka domestic connection ho
  • Roof par ownership ya society ki likhit permission
  • Installation ALMM-listed DCR panels ke saath, registered vendor se
  • Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti

Process — registration se paise aane tak

  1. 1PM Surya Ghar portal par consumer number aur mobile se registration
  2. 2CSPDCL ki technical feasibility approval ka intezaar
  3. 3Registered vendor select karke installation
  4. 4Installation ke baad plant details aur photos portal par upload
  5. 5CSPDCL inspection aur bi-directional net meter installation
  6. 6Commissioning certificate generate hone ke baad bank details submit
  7. 7DBT ke through subsidy seedhe bank account mein

Documents ready rakhiye

  • Latest CSPDCL bill (consumer number ke liye)
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque — DBT isi account mein aayega
  • Roof ownership proof ya society NOC

Durg-Bhilai mein practical baat

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

5 kW ke liye terrace ki requirement

5 kW ke liye lagbhag paanch sau square feet shadow-free chhat chahiye hoti hai, ya elevated structure par kareeb saadhe teen sau square feet usable. Is size par terrace ka poora naksha design mein aata hai: das modules ki rows, unke beech spacing, chaaron taraf cleaning walkway, aur cable route. Aksar yeh size uss point par pahunchta hai jahan ghar ki chhat par doosri cheezon — tanki, kapde sukhane ki jagah — ke saath negotiation karni padti hai.

Aksar poochhe jaane waale sawaal

Subsidy aane mein kitna time lagta hai?
Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
Kya battery par bhi subsidy milti hai?
Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
DCR panel zaroori hai kya?
Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
5 kW ka price confirmed kyun hai aur baaki ka nahi?
5 kW hamara business-confirmed reference configuration hai. Baaki capacities uske per-kW rate se nikali gayi hain, isliye unhe hum indicative kehte hain — final figure survey ke baad quotation mein aata hai.
5 kW par single-phase chalega ya three-phase chahiye?
5 kW tak aam taur par single-phase chal jaata hai. Yeh aapke existing connection aur CSPDCL ki sanction par depend karta hai — survey mein hum aapka bill dekh kar confirm karte hain.