DBSDurg Bhilai Solar

3 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process

3 kW par ₹1,08,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

3 kW residential rooftop par PM Surya Ghar ke tehat ₹78,000 central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹1,08,000 tak. 3 kW ke baad central support badhta nahi — isliye yahi woh range hai jahan subsidy ka percentage sabse behtar baithta hai.

3 kW par support apne peak par pahunch jaata hai

3 kW aur usse upar, central support 78,000 par cap ho jaata hai aur Chhattisgarh ka hissa 30,000 — kul 1,08,000. 4 kW, 6 kW ya 10 kW, teenon par yahi figure rehta hai. Isliye percentage ke hisaab se 3 kW sabse aage nikalta hai. Faisla karte waqt yeh dekhna chahiye ki aapko zyada generation chahiye ya zyada support-percentage — dono ek saath nahi milte, aur yahi is size ka core trade-off hai.

Support kaise banta hai

Capacity slabCentral supportCG state support
1 kW tak₹30,000₹15,000
2 kW tak₹60,000₹30,000
3 kW aur upar₹78,000₹30,000
Aapka 3 kW system₹78,000₹30,000
PM Surya Ghar slab structure aur 3 kW par uska effect

Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 3 kW par yeh gross price ka lagbhag 59% banta hai.

Eligible kaun hai

  • Residential consumer, jiske naam par CSPDCL ka domestic connection ho
  • Roof par ownership ya society ki likhit permission
  • Installation ALMM-listed DCR panels ke saath, registered vendor se
  • Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti

Process — registration se paise aane tak

  1. 1PM Surya Ghar portal par consumer number aur mobile se registration
  2. 2CSPDCL ki technical feasibility approval ka intezaar
  3. 3Registered vendor select karke installation
  4. 4Installation ke baad plant details aur photos portal par upload
  5. 5CSPDCL inspection aur bi-directional net meter installation
  6. 6Commissioning certificate generate hone ke baad bank details submit
  7. 7DBT ke through subsidy seedhe bank account mein

Documents ready rakhiye

  • Latest CSPDCL bill (consumer number ke liye)
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque — DBT isi account mein aayega
  • Roof ownership proof ya society NOC

Durg-Bhilai mein practical baat

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

3 kW ke liye chhat par jagah nikalna

3 kW ke liye lagbhag teen rows ki planning hoti hai, aur yahan pehli baar chhat ka pura naksha maayne rakhne lagta hai — tanki kahan hai, mumty kahan, aur cable inverter tak kis raaste jaayega. Agar chhat par pehle se kapde sukhane ki jagah ya paani ki tanki hai, to elevated structure ka option seriously dekhna chahiye: usse aap tanki ke upar se area recover kar lete hain aur neeche ki jagah bhi bachi rehti hai.

Aksar poochhe jaane waale sawaal

Subsidy aane mein kitna time lagta hai?
Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
Kya battery par bhi subsidy milti hai?
Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
DCR panel zaroori hai kya?
Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
3 kW ke baad subsidy kyun nahi badhti?
PM Surya Ghar ka central support 3 kW slab par cap hai — yeh scheme ka design hai. Isliye bade system par support ka percentage ghatta jaata hai, absolute figure wahi rehta hai.
Mera sanctioned load 2 kW hai, 3 kW lag sakta hai?
Pehle sanctioned load enhancement ki application deni hogi. Yeh step shuru mein karna chahiye — baad mein pata chalne par poora process peeche khisak jaata hai.

Sources

Related guides