DBSDurg Bhilai Solar

2 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process

2 kW par ₹90,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

2 kW residential rooftop par PM Surya Ghar ke tehat ₹60,000 central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹90,000 tak. Is capacity par support percentage sabse zyada padta hai, kyunki system chhota hai lekin slab-wise support fixed hai.

2 kW ka slab — support dogunaa ho jaata hai

2 kW woh jagah hai jahan scheme ka structure aapke haq mein kaam karta hai: central support 60,000 aur state 30,000 — 1 kW ke muqable support theek dogunaa, jabki system cost bhi lagbhag dogunaa hi hai. Iska matlab hai ki support ka percentage 1 kW jaisa hi strong rehta hai, lekin aapko dugni generation milti hai. Agar aap 1 kW aur 2 kW ke beech soch rahe hain, to yeh comparison decisive hota hai.

Support kaise banta hai

Capacity slabCentral supportCG state support
1 kW tak₹30,000₹15,000
2 kW tak₹60,000₹30,000
3 kW aur upar₹78,000₹30,000
Aapka 2 kW system₹60,000₹30,000
PM Surya Ghar slab structure aur 2 kW par uska effect

Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 2 kW par yeh gross price ka lagbhag 74% banta hai.

Eligible kaun hai

  • Residential consumer, jiske naam par CSPDCL ka domestic connection ho
  • Roof par ownership ya society ki likhit permission
  • Installation ALMM-listed DCR panels ke saath, registered vendor se
  • Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti

Process — registration se paise aane tak

  1. 1PM Surya Ghar portal par consumer number aur mobile se registration
  2. 2CSPDCL ki technical feasibility approval ka intezaar
  3. 3Registered vendor select karke installation
  4. 4Installation ke baad plant details aur photos portal par upload
  5. 5CSPDCL inspection aur bi-directional net meter installation
  6. 6Commissioning certificate generate hone ke baad bank details submit
  7. 7DBT ke through subsidy seedhe bank account mein

Documents ready rakhiye

  • Latest CSPDCL bill (consumer number ke liye)
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque — DBT isi account mein aayega
  • Roof ownership proof ya society NOC

Durg-Bhilai mein practical baat

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

2 kW ke liye chhat ki planning

2 kW ke liye chaar panels ki do rows chahiye hoti hain, aur yahin se inter-row spacing ka sawaal shuru hota hai — aage wali row ki shadow peechhe wali par na pade. Chhoti terrace par log aksar rows ko chipka kar laga dete hain, aur sardi ke mahinon mein jab sooraj neecha hota hai, tab output girta hai aur kisi ko samajh nahi aata kyun. Layout mein spacing ka number design drawing par likha hona chahiye.

Aksar poochhe jaane waale sawaal

Subsidy aane mein kitna time lagta hai?
Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
Kya battery par bhi subsidy milti hai?
Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
DCR panel zaroori hai kya?
Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
2 kW se AC chalega?
Din ke waqt ek chhota AC kuch der chal sakta hai, lekin baaki load ke saath nahi. Agar AC regular chalana hai to sizing us load ko maan kar honi chahiye — warna aap grid se hi kheenchte rahenge.
1 kW aur 2 kW mein kaun sa behtar hai?
Support 1 kW se 2 kW par theek dogunaa ho jaata hai jabki cost bhi lagbhag dugni hi hoti hai. Isliye agar chhat aur bill dono allow karte hain, to 2 kW aam taur par behtar sauda nikalta hai.

Sources

Related guides