DBSDurg Bhilai Solar

1 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process

1 kW par ₹45,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

1 kW residential rooftop par PM Surya Ghar ke tehat ₹30,000 central support aur Chhattisgarh state ki taraf se ₹15,000 — total ₹45,000 tak. Is capacity par support percentage sabse zyada padta hai, kyunki system chhota hai lekin slab-wise support fixed hai.

Chhote system par support ka percentage sabse behtar

1 kW woh slab hai jahan central support 30,000 rupaye par rukta hai aur state ka hissa 15,000 — yaani kul 45,000. Percentage mein yeh system cost ka bada hissa banta hai, aur yahi 1 kW ka sabse strong argument hai. Lekin dhyan rakhiye ki agla slab (2 kW) support ko dogunaa kar deta hai jabki cost sirf dugni hoti hai — isliye agar aapka bill borderline hai, to 2 kW par jaana aksar behtar sauda nikalta hai. Yeh calculation survey mein hum aapke saamne dono column mein rakh dete hain.

Support kaise banta hai

Capacity slabCentral supportCG state support
1 kW tak₹30,000₹15,000
2 kW tak₹60,000₹30,000
3 kW aur upar₹78,000₹30,000
Aapka 1 kW system₹30,000₹15,000
PM Surya Ghar slab structure aur 1 kW par uska effect

Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 1 kW par yeh gross price ka lagbhag 74% banta hai.

Eligible kaun hai

  • Residential consumer, jiske naam par CSPDCL ka domestic connection ho
  • Roof par ownership ya society ki likhit permission
  • Installation ALMM-listed DCR panels ke saath, registered vendor se
  • Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti

Process — registration se paise aane tak

  1. 1PM Surya Ghar portal par consumer number aur mobile se registration
  2. 2CSPDCL ki technical feasibility approval ka intezaar
  3. 3Registered vendor select karke installation
  4. 4Installation ke baad plant details aur photos portal par upload
  5. 5CSPDCL inspection aur bi-directional net meter installation
  6. 6Commissioning certificate generate hone ke baad bank details submit
  7. 7DBT ke through subsidy seedhe bank account mein

Documents ready rakhiye

  • Latest CSPDCL bill (consumer number ke liye)
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque — DBT isi account mein aayega
  • Roof ownership proof ya society NOC

Durg-Bhilai mein practical baat

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

Ek chhoti chhat par 1 kW

1 kW ke liye chhat ka bada hissa nahi chahiye, lekin jo chahiye woh poori tarah shadow-free hona chahiye. Chhote array par ek bhi panel ka shaded hona aadha system band kar dene jaisa hai — bade array mein ek panel ka nuksan proportionally chhota hota hai, yahan nahi. Chhoti chhaton par doosri dikkat parapet wall ki hoti hai: teen-chaar feet ki deewar subah aur shaam lambi shadow daalti hai, aur usi corner mein log panel lagana chahte hain kyunki wahi khali hota hai.

Aksar poochhe jaane waale sawaal

Subsidy aane mein kitna time lagta hai?
Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
Kya battery par bhi subsidy milti hai?
Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
DCR panel zaroori hai kya?
Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
1 kW se kitne appliance chalenge?
Din ke waqt lights, fans, ek fridge aur TV ke aas-paas ka load. AC, geyser ya pump ke liye yeh capacity nahi hai — woh grid se hi chalenge.
Baad mein 1 kW se badha sakte hain?
Haan, lekin inverter ki rating aur CSPDCL ka sanction dono revise karne padte hain. Agar aapko lagta hai ki aage badhana hai, to abhi inverter mein thoda headroom rakhwa lijiye — baad mein poora inverter badalne se sasta padta hai.

Sources

Related guides