Seedha jawab
1 kW residential rooftop par PM Surya Ghar ke tehat ₹30,000 central support aur Chhattisgarh state ki taraf se ₹15,000 — total ₹45,000 tak. Is capacity par support percentage sabse zyada padta hai, kyunki system chhota hai lekin slab-wise support fixed hai.
Chhote system par support ka percentage sabse behtar
1 kW woh slab hai jahan central support 30,000 rupaye par rukta hai aur state ka hissa 15,000 — yaani kul 45,000. Percentage mein yeh system cost ka bada hissa banta hai, aur yahi 1 kW ka sabse strong argument hai. Lekin dhyan rakhiye ki agla slab (2 kW) support ko dogunaa kar deta hai jabki cost sirf dugni hoti hai — isliye agar aapka bill borderline hai, to 2 kW par jaana aksar behtar sauda nikalta hai. Yeh calculation survey mein hum aapke saamne dono column mein rakh dete hain.
Support kaise banta hai
| Capacity slab | Central support | CG state support |
|---|---|---|
| 1 kW tak | ₹30,000 | ₹15,000 |
| 2 kW tak | ₹60,000 | ₹30,000 |
| 3 kW aur upar | ₹78,000 | ₹30,000 |
| Aapka 1 kW system | ₹30,000 | ₹15,000 |
Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 1 kW par yeh gross price ka lagbhag 74% banta hai.
Eligible kaun hai
- Residential consumer, jiske naam par CSPDCL ka domestic connection ho
- Roof par ownership ya society ki likhit permission
- Installation ALMM-listed DCR panels ke saath, registered vendor se
- Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti
Process — registration se paise aane tak
- 1PM Surya Ghar portal par consumer number aur mobile se registration
- 2CSPDCL ki technical feasibility approval ka intezaar
- 3Registered vendor select karke installation
- 4Installation ke baad plant details aur photos portal par upload
- 5CSPDCL inspection aur bi-directional net meter installation
- 6Commissioning certificate generate hone ke baad bank details submit
- 7DBT ke through subsidy seedhe bank account mein
Documents ready rakhiye
- Latest CSPDCL bill (consumer number ke liye)
- Aadhaar aur PAN
- Bank passbook ya cancelled cheque — DBT isi account mein aayega
- Roof ownership proof ya society NOC
Durg-Bhilai mein practical baat
Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.
Ek chhoti chhat par 1 kW
1 kW ke liye chhat ka bada hissa nahi chahiye, lekin jo chahiye woh poori tarah shadow-free hona chahiye. Chhote array par ek bhi panel ka shaded hona aadha system band kar dene jaisa hai — bade array mein ek panel ka nuksan proportionally chhota hota hai, yahan nahi. Chhoti chhaton par doosri dikkat parapet wall ki hoti hai: teen-chaar feet ki deewar subah aur shaam lambi shadow daalti hai, aur usi corner mein log panel lagana chahte hain kyunki wahi khali hota hai.
Aksar poochhe jaane waale sawaal
- Subsidy aane mein kitna time lagta hai?
- Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
- Kya battery par bhi subsidy milti hai?
- Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
- DCR panel zaroori hai kya?
- Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
- 1 kW se kitne appliance chalenge?
- Din ke waqt lights, fans, ek fridge aur TV ke aas-paas ka load. AC, geyser ya pump ke liye yeh capacity nahi hai — woh grid se hi chalenge.
- Baad mein 1 kW se badha sakte hain?
- Haan, lekin inverter ki rating aur CSPDCL ka sanction dono revise karne padte hain. Agar aapko lagta hai ki aage badhana hai, to abhi inverter mein thoda headroom rakhwa lijiye — baad mein poora inverter badalne se sasta padta hai.
Sources
Related guides
Financing
1 kW Solar EMI — Monthly Kitna Banega aur Bill se Kitna Adjust Hoga
Generation & savings
1 kW Solar Kitni Units Banata Hai? — Durg-Bhilai ka Realistic Output
Technical
1 kW Solar ke liye Kitni Chhat Chahiye? — Area, Layout aur Shadow
Subsidy
2 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process
Subsidy
Solar Subsidy in Durg & Bhilai — Poora Process