DBSDurg Bhilai Solar

Solar Subsidy in Durg & Bhilai — Poora Process

Durg aur Bhilai mein rooftop solar par ₹1,08,000 tak combined support — slab, eligibility, documents, CSPDCL steps aur DBT timeline, ek jagah.

Durg Bhilai Solar Editorial TeamReviewed by: Durg Bhilai Solar Technical ReviewLast reviewed:
Indian homeowner apne ghar par solar subsidy ke documents dekhte hue

Seedha jawab

Durg aur Bhilai ke eligible residential consumers ko PM Surya Ghar se ₹78,000 tak central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹1,08,000 tak milta hai. Central support 3 kW ke slab par cap ho jaata hai, isliye 3 kW se upar system par figure wahi rehta hai.

SlabCentral (PM Surya Ghar)CG state (CREDA)Total
1 kW tak₹30,000₹15,000₹45,000
2 kW tak₹60,000₹30,000₹90,000
3 kW aur upar₹78,000₹30,000₹1,08,000
Capacity slab ke hisaab se support

Eligibility — char shartein

  • CSPDCL ka domestic (residential) connection, aapke ya parivaar ke naam par
  • Chhat par ownership, ya society/owner ki likhit permission
  • ALMM-listed DCR panels — cell aur module dono India mein bane
  • Registered vendor se installation aur CSPDCL se net-metering sanction

Process — shuru se paise aane tak

  1. 1PM Surya Ghar portal par CSPDCL consumer number se registration
  2. 2CSPDCL ki technical feasibility approval
  3. 3Zaroorat par sanctioned load enhancement
  4. 4Registered vendor se installation
  5. 5Portal par plant details aur photos upload
  6. 6CSPDCL inspection aur bi-directional net meter
  7. 7Commissioning certificate, phir bank details submit
  8. 8DBT se subsidy seedhe bank account mein — aam taur par 30–45 din

Documents ki list

  • Latest CSPDCL bill — consumer number aur sanctioned load isi par hote hain
  • Aadhaar aur PAN
  • Bank passbook ya cancelled cheque (DBT isi account mein aayega)
  • Roof ownership proof ya society NOC

Kya support ke dayre se bahar hai

Battery, hybrid inverter ka extra cost, aur off-grid setup — in par koi support nahi milta. Commercial aur industrial capacity (aam taur par 10 kW se upar ke non-residential systems) bhi residential scheme mein nahi aati. Agar koi vendor in par subsidy ka dava kare, uska official reference maangiye.

Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.

Aksar poochhe jaane waale sawaal

Subsidy ke liye kaun apply karta hai — main ya vendor?
Registration consumer ke naam par hota hai aur portal par aapka login hota hai. Vendor documentation aur upload mein madad karta hai, lekin account aapka rehta hai — aur wahi sahi bhi hai.
Kya purane installation par subsidy mil sakti hai?
Nahi. Portal par pehle registration aur feasibility approval, phir installation — yeh sequence zaroori hai. Pehle laga kar baad mein claim karna kaam nahi karta.
State support ka process alag hai?
State top-up usi rooftop installation ke saath process hota hai. Current position aur timelines ke liye CREDA ke official notifications dekhna sahi rehta hai.

Sources

Related guides