10 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process
10 kW par ₹1,08,000 tak combined support — eligibility, documents, application steps aur DBT timeline, Durg aur Bhilai ke liye.

Seedha jawab
10 kW residential rooftop par PM Surya Ghar ke tehat ₹78,000 central support aur Chhattisgarh state ki taraf se ₹30,000 — total ₹1,08,000 tak. Support 3 kW ke slab par cap ho jaata hai, isliye bade system par subsidy ka percentage kam dikhta hai — lekin absolute savings zyada hoti hai.
10 kW par support ka role
10 kW par support ka figure — 1,08,000 — gross cost ke muqable chhota dikhta hai. Is capacity par faisla lagbhag poori tarah generation, tariff aur self-consumption par hota hai. Agar property commercial category mein hai, to residential support milta hi nahi aur uski jagah tax treatment ka sawaal aata hai, jise aapke CA ke saath dekhna chahiye — hum tax advice nahi dete.
Support kaise banta hai
| Capacity slab | Central support | CG state support |
|---|---|---|
| 1 kW tak | ₹30,000 | ₹15,000 |
| 2 kW tak | ₹60,000 | ₹30,000 |
| 3 kW aur upar | ₹78,000 | ₹30,000 |
| Aapka 10 kW system | ₹78,000 | ₹30,000 |
Dhyan dijiye ki central support 3 kW par cap ho jaata hai — 4 kW, 6 kW ya 10 kW, teenon par central figure ₹78,000 hi rehta hai. 10 kW par yeh gross price ka lagbhag 18% banta hai.
Eligible kaun hai
- Residential consumer, jiske naam par CSPDCL ka domestic connection ho
- Roof par ownership ya society ki likhit permission
- Installation ALMM-listed DCR panels ke saath, registered vendor se
- Net metering CSPDCL se sanction hona zaroori — uske bina DBT release nahi hoti
Process — registration se paise aane tak
- 1PM Surya Ghar portal par consumer number aur mobile se registration
- 2CSPDCL ki technical feasibility approval ka intezaar
- 3Registered vendor select karke installation
- 4Installation ke baad plant details aur photos portal par upload
- 5CSPDCL inspection aur bi-directional net meter installation
- 6Commissioning certificate generate hone ke baad bank details submit
- 7DBT ke through subsidy seedhe bank account mein
Documents ready rakhiye
- Latest CSPDCL bill (consumer number ke liye)
- Aadhaar aur PAN
- Bank passbook ya cancelled cheque — DBT isi account mein aayega
- Roof ownership proof ya society NOC
Durg-Bhilai mein practical baat
Durg aur Bhilai ki chhaton par do cheezein sabse zyada output kharaab karti hain — Bhilai Steel Plant belt ki industrial dhool, aur paani ki tanki ya mobile tower ki shadow.
10 kW ke liye chhat ki reality
10 kW ke liye lagbhag ek hazaar square feet shadow-free area chahiye. Itni badi chhat par shadow ka pattern din bhar badalta hai, isliye survey mein hum kam se kam teen time-slots par shadow plot karte hain. Structure is scale par ek engineering item ban jaata hai — gauge, spans aur anchoring sab calculation par hote hain, aur uska design document maangna chahiye, sirf zubani assurance nahi.
Aksar poochhe jaane waale sawaal
- Subsidy aane mein kitna time lagta hai?
- Net meter lagne aur portal par commissioning report upload hone ke baad aam taur par 30–45 din. Sabse common delay bank account mismatch aur net-metering file adhoori hone se aata hai.
- Kya battery par bhi subsidy milti hai?
- Nahi. Dono schemes grid-connected rooftop ke liye hain. Battery aur off-grid setup support ke dayre se bahar hain — is par koi bhi vendor jo subsidy ka dava kare, uska likhit proof maangiye.
- DCR panel zaroori hai kya?
- Haan, subsidy claim ke liye. DCR ka matlab hai ki cell aur module dono India mein bane hon. Non-DCR panel sasta mil sakta hai, lekin us installation par support claim nahi hota.
- 10 kW par residential subsidy milegi?
- Agar connection residential category mein hai aur baaki shartein poori hain, to haan — lekin amount 3 kW slab par cap hota hai. Commercial category ke connection par residential support applicable nahi hota.
- 10 kW se bada system lagwana ho to?
- Usse upar aam taur par commercial-scale project hota hai, jiska pricing, approval aur tax treatment alag hai. Uske liye hum alag se survey aur quotation karte hain.
Sources
Related guides
Financing
10 kW Solar EMI — Monthly Kitna Banega aur Bill se Kitna Adjust Hoga
Generation & savings
10 kW Solar Kitni Units Banata Hai? — Durg-Bhilai ka Realistic Output
Technical
10 kW Solar ke liye Kitni Chhat Chahiye? — Area, Layout aur Shadow
Subsidy
8 kW Solar Subsidy — PM Surya Ghar + CREDA, Durg-Bhilai Process
Subsidy
Solar Subsidy in Durg & Bhilai — Poora Process